Oil-And-Gas Main Pipeline Construction

main-photo

2022 year Reconstruction of the intersection of the main gas pipeline “Kremenchuk-Kropyvnytskyi” 500 mm diameter, according to the project documentation for the object: Major repair of the highway M-12 Stryi-Ternopil-Kropyvnytskyi-Znamyanka (through the city of Vinnytsia) on the section km707+714-km 714- 545»

  • Construction of a passage through a/d by the HNB MG 700 mm method;
  • Construction of a passage through a/d using the HNB MG 600 mm;
  • Construction of a passage through a/d by the HNB MG 200 mm method;
  • laying of communication cable Du 100 (PVC110).

The customer is the Highway Service in the Kirovohrad region.

2021 year Reconstruction of the section of the main gas pipeline “Yelets-Kremenchuk-Kryvyi Rih” Du 1400 mm Ru 7.5 MPa during the reconstruction of the highway of state importance H-31 Dnipro-Tsarychanka-Kobeliaky-Reshetylivka on the section km 150 + 000 – km 155 + 000, km 155 + 000 – km 159 + 965 Poltava region. Service of highways in Poltava region. Ukraine.
2020 year Reconstruction of the section of the main oil pipeline “Lysychansk-Kremenchuk” Du 1000 mm Ru 5.5 MPa for 358 km during the construction of the bypass of Kobeliaky on the section km 116 + 500 – km 119 + 700 during the reconstruction of the highway of state importance H-31 Dnipro-Tsarychanka- Kobeliaky-Reshetylivka. Service of highways in Poltava region. Ukraine.
Reconstruction of the section of the main gas pipeline “SOYUZ” Du 1400 mm Ru 7.5 MPa at 1633 km during the construction of the bypass of Kobeliaky on the section km 116 + 500 – km 119 + 700 during the reconstruction of the highway of state importance H-31 Dnipro-Tsarychanka-Kobeliaky -Reshetylivka, Poltava region. Contract №118-01-19 of 13.05.2019, Service of highways in Poltava region. Ukraine.
2019 Reconstruction of the Ivatsevychi – Dolyna (Line II) gas main at the Dniester River cross at 457 km. Construction of 1220×15.2 mm in diameter, 630.5 m long underwater gas main section by horizontal directional drilling for Gas Transmission System Operator Affiliate of Ukrtransgaz JSC, Ukraine.
Reconstruction of the Kyiv – West of Ukraine (Line II) gas main at the Dniester River cross at 518 km. Construction of 1220×15.2 mm in diameter, 563.0 m long, underwater gas main section using the HDD method for Gas Transmission System Operator Affiliate of Ukrtransgaz JSC, Ukraine.
2018 Reconstruction of the Dykanka – Kremenchuk – Kryvyi Rih gas pipeline section of DN700 and PN5.5 MPa at 78 km while building the traffic overpass and interchange at 130+045 km during the reconstruction of the Dnipropetrovsk – Tsarychanka – Kobelyaky – Reshetylivka national highway from 129 km + 400 m to 131 km + 150 m. Construction of 1790 m long and 720 mm in diameter gas pipeline section for Poltavaavtodor, Ukraine.
2016 Construction of the transition of the Du1020x12, 60 gas pipeline through the T-2110 km 77 + 850 highway by the method of horizontal directional drilling. Contract No. 15/16. PJSC “Ukrgasdobycha”. Ukraine.
2013-
2014
Construction of the 47 km long Kutayisi – Abasha gas pipeline section of DN700 for the Georgian oil-and-gas Corporation LLC.
Construction of the 650 m long crossing under the Rioni River by horizontal directional drilling.
Construction of the 120 m long crossing beneath the railway and motor road using the HDD method.
2012 Construction of the first stage actuation unit for the waste treatment facilities of the Ananyiv – Izmayil (Line II) gas main for Gaztranzyt, PrJSC.
2010 Construction-and-assembling operations at the Ananyiv – Tyraspyl – Izmayil gas main construction site for Tyraspyl-Prydnistrovya LLC.
2009 Engineering and surveying, developing the Contractor’s design of the insulation coating overhaul with partial pipe replacement at the Kamyanka – Buzka – Rivne (Line I) piping from 73.0 km to 83.0 km for the Rivne Regional LVUMG at the Lvivtransgaz UMG.
2007 Constructing 23.4 km of DN700 and DN500 loopings at the Brody – State Border oil line using 720×10 mm and 530×10 mm pipes with 3-layer pre-insulation in the Ivano-Frankivsk Region of Ukraine for Ukrtransnafta JSC.
2006 Manual and automatic electric welding in a shielding gas environment of DN1200, PN7.5 MPa, and 21 mm wall thickness pipeline at the IPS Beregovye Truboprovody gas main construction site (Sakhalin-2 project) for Starstroy LLC, Russia.