2013-
2014 years |
Construction of 47-km section of the pipeline “Kutaisi-Abasha”, Georgia. Construction of crossings under the Highway and Railway 350m method for these crossings is HDD. |
|
Construction the crossings under the river Rioni 650m method for these crossings is Horizontal Directional Drilling (HDD). |
|
Construction the crossing under the railway and highway 120 m by Horizontal Directional Drilling. |
2012 year |
Construction launching point cleaning devices on pipeline Ananev-Ishmael (II thread), first round. PJSC «Gaztranzit». |
2010 year |
Construction and installation work on the construction site of the MP “Ananiev – Tiraspol – Izmail”, LLC “Tiraspol – Pridnisrovia”. |
2009 year |
Engineering – development works and the development of working draft overhaul of the insulating coating (with partial replacement of the pipe) MG “Kamianka – Buzko – Rivne», I thread, 73,0-83,0 km, Rivne LVUMG . UMG “Lvovtransgas”. |
2007 year |
Construction of oil pipeline looping “Brody – Gosgranitsa”, Dn=700mm and Dn=500mm at section wish total length L=23.4km. Pipes 720х10mm and 530х10mm wish three – layered factory insulation. Place of construction – Ukraine, Ivano – Frankovskiy region. Customer – OJSC “Ukrtransneft”. |
2006 year |
Welding (manual, electric and automatic electric welding in shielding gases) on the construction site of the pipeline “Onshore Pipelines” (Sakhalin-2 project), of Dn = 1200 mm, wall thickness – 21mm, operating pressure – P = 7,5MPa. The total length of section L = 73 km. The country – Russian Federation. General Contractor LTD “Starstroi”. |