All posts by NEFTEGAZ

Alexander Itkin

Chairman of the GC «PVI ZIT «Naftogazbudizolyatsiya»

Academician of the Academy Construction of Ukraine, Professor, Doctor of Technical Sciences, Doctor of Economic Sciences.

Alexander Itkin is the author of over 50 inventions of machines, equipment and systems for the repair and construction of trunk oil and gas pipelines, and the author of over 100 publications, including 4 monographs.

Yuri Domin

General manager of the PJSC «PVI ZIT «Naftogazbudizolyatsiya»

Doctor of Technical Sciences

Iurii Domin is the author of several works on technology of repair pipelines and author of a number of patents and copyright certificates on inventions of machines and systems for the repair of pipelines in the oil and gas industry.

Svetlana Fedotova

Head of the department of foreign economic activity of the GC «PVI ZIT «Naftogazbudizolyatsiya»

Doctor of Economic Sciences

Replacement of insulation coating for hot apron of compressor stations

main-photo6

2018 year Repair of underground technological pipelines of KS Ternopil. Customer UMG “Lvovtransgaz”. Ukraine.
Repair of insulation coating and defective sections of water pipes of the cooling system of the mining and metallurgical complex of Ugersko gas condensate complex (work related to completed or unfinished construction projects and civil engineering facilities)
Repair of the insulation coating of the technological piping of the BCS Bilche-Volitsa (Construction and installation works)
2016 year Selective repair of the insulation coating of underground pipelines of KS Zadneprovskaya, KS-34B Sofievskaya, KS-37B Bar. Contract No. 1607000228. UMG Cherkasytransgaz. Ukraine.
2010 year Insulation works on the subject of reconstruction CS Just, UMG “Prikarpattransgaz”.
2008 year Overhaul of the CS “Rzhevskaya” Customer – LLC “Gazprom Transgaz St. Petersburg”.
Overhaul of the CS “Jubilee”, Customer – LLC “Gazprom Transgaz Ukhta”.
Overhaul CS “Smolenskaya”, Customer – LLC “Gazprom Transgaz St. Petersburg”.
Reconstruction of technological loops CS “Uzhgorod”, “Ukrtransgaz”.
Re-insulation of industrial pipelines TCC-4 CS “Inder”. The Republic of Kazakhstan.
2007 year Overhaul of insulating coatings of pipelines “high side” and connects the loops of gas transportation system of OAO “Gazprom”, including:

  • CS “Urdoma” LLC “Severgasprom”;
  • CS “Sindor” LLC “Severgasprom”;
  • CS “Kozhurlinskaya”, LLC “Tomsktransgaz”
  • CS “Proskonovo”, LLC “Tomsktransgaz”;
  • CS “Zhirkov Hill”, LLC “Lentransgaz”.
2006 year Reinsulation of technological pipelines Dn=1000mm of Compressor stations of OJSC “ Gasprom” Gastransport System, including:

  • CS “Mikun” (“Severgasprom” Co. Ltd.);
  • CS “Kholm-Zhirkovskiy” (“Lentransgas” Co. Ltd.);
  • CS “Picalevo”(“Lentransgas” Co. Ltd.);
  • CS “Privodino” (“Severgasprom” Co. Ltd.);
  • CS “Sheksninskaya” (“Severgasprom” Co. Ltd.);
  • CS “Kushevskaya” (“Kubangasprom” Co. Ltd.);
  • CS “Georgievskaya” (“Kavkastransgas” Co. Ltd.);
  • CS “Volkhov” (“Lentransgas” Co. Ltd.).

Material of insulation for application – Scotchkote 352ht. Work was performed after proper accreditation of GC “Neftegasstroyizolyatsia” at transport and gas storage Department of OJSC “Gasprom”.

2003 year Modernization of a booster compressor station “Opara-2.” Customer – UMG “Lvovtransgas” “Ukrtransgaz”.
Overhaul of the CS-17 “Gryazovets” Customer – LLC “Severgasprom. Russian Federation.

Repairing of insulation without stopping of transportation product in the pipelines

main-photo5

2018 year Restoration of the design depth of the gas pipeline branch to the GDS of the Nikolaev Alumina Plant selectively in the area of ​​km 5.4- km 11.7, with partial replacement of the pipe up to 1536 m with the replacement of the insulation coating on sections up to 2554 m in length within the service of the Nikolaev LPUMG
2017 year Selective repair of the insulation coating MG KZU-II Du1200 Ru 5.4 MPa 420.499-440.07 km with a total length of sections of 3525 m. (Works related to completed or unfinished construction projects and civil construction projects)
Selective repair of the insulation coating of Ivatsevichi MG – Valley III Du 1200, Ru 5.4 MPa, in the area of ​​km 431.85 – km 510.00 with a length of 2944 m. Contract No. 170600282 dated 06/21/2017. UMG “Lvovtransgaz”. Ukraine.
2015 year Repair oil Mozyr-Brest, Dm 720 mm, on oparetion site 74+00-84+000″ (6 launch complex 82 + 180 km 84 + 000 km). The customer JSC “Gomeltransneft Friendship”, Belarus.
2012 year Repair insulation coating MP “Novodarevka – Amvroseevka” Dn 700 L-63,980 km, on the site 64 – 95 km: Stage 2 – the section 90 – 95 km, L = 4,8km (Makeyevka LPUMG). UMG “Donbastransgaz”.
Selective repair of insulation coating MG “KAB”, MG “EKKR” Dn 1400. UMG “Cherkasytransgaz.
Elimination of defects of special corrosion-resistant coatings with a protective coating based on polyurethane resins (pilot project), the Republic of Belarus, JSC Beltransgaz.
Insulating works “gas pipeline branch to GRS SRES, DN-500, L-8,247 km, repair of insulation coating with a total length L = 5,245 km (from PK 0 + 00 to the PC 37 + 27, to the PC 67+29 to the PC 82+47), with partial replacement of the pipe (up 10%), Kramatorsk LVUMG “UMG” Donbastransgaz”.
Re-insulation of underground parts of the taps pipelines, UMG “Cherkasytransgaz”.
Local repair of insulation coating MG “Union”, Mg “Urengoy – Pomary – Uzhgorod” MG “Progress” DN 1400 mm, UMG “Cherkasytransgaz”.
Insulating works accident-prone beams MP “VGA” UMG “Cherkasytransgaz”.
Re-isolation and excavation work for laying MP “Union” in the design marks according to the results (section km 2573-2664) “VNIPITRANSGAZ” surveys Khust LVUMG, UMG “Prikarpattransgaz”.
Selective repair of insulation coating MP “VGA”, according to a comprehensive “IPP” surveys VNIPITRANSGAZ “. Khust LVUMG, UMG “Prikarpattransgaz”.
Overhaul of the insulating covering MG “ACD – II”, DN 1200, UMG Prikarpattransgaz.
Coating polyurethane insulating materials of ball valves and joints PUV 1, UMG Lvovtransgas.
Repair insulation coating MP “Ivatsevichi – Dolina» II, III thread DN 1200, MP “Bilche-Volitsa” DN 1400 UMG Lvovtransgas.
Repair insulation coating on MP “Ivavtsevii- Komarno” DN 800, MG “Komarno – State Border” DN 700, MG “Pukenichi – Komarno” DN 700, UMG Lvovtransgas.
2010 year Insulation works on construction of the MP “Armyansk – Dzhankoy” DK “Chornomorneftegaz”.
Selective repair of insulation coating pipeline – branch to GRS DN500) kramatorsk, UMG “Donbastransgaz”.
Overhaul of the MP with the restoration of the carrier pipe body capacity, identified as a result of in-line inspection, through the establishment of two-layer sleeves in wetlands MP “UNION” 1880,55- 1880,59km (repair in the swamp), UMG “Cherkasytransgaz”.
Repair insulation MP “VGA” on the site Dn1400mm Barskogo LVUMG, UMG “Cherkasytransgaz”.
Local repair of insulation coating MP “Progress” DN 1400 mm, UMG “Cherkasytransgaz”.
Local repair of insulation coating MP “Union”, DN 1400 mm, UMG “Cherkasytransgaz”.
2009 year Repair insulation MP “VGA” on the site DN 1400mm Barsky LVUMG, UMG “Cherkasytransgaz”.
Repair insulation MP “Progress” on the site Dn1400mm Barsky LVUMG, UMG “Cherkasytransgaz”.
Repair insulation MP “The Union” at the site Dn1400mm Barsky LVUMG, UMG “Cherkasytransgaz”.
2006 year MP “Elec-Kremenchuk-Kryvyi Rig», Dn = 1200 mm. Customer – UMG “Kievtransgaz” “Ukrtransgaz”.
Overhaul MP “Ivatsevichi-Dolina», Dn = 1200 mm, operating pressure P = 5,8MPa. Country Ukraine. Customer – UMG “Lvovtransgas” “Ukrtransgaz”.
2005 year Overhaul MP “Mozdok-Kazimagomed», Dn = 1200 mm, operating pressure P = 5.5 MPa (Republic of Dagestan, Russian Federation). Customer – LLC “Kaspiygazprom” OAO “Gazprom” Makhachkala.
2003 year Reconstruction of overhead crossings Dn = 700 mm and Dn = 1000 mm over the river. Goren. Lviv region., Ukraine. Customer – UMG “Lvovtransgas” “Ukrtransgaz”.
Overhaul MP “Kamianka-Buzko-Exactly-I» Dn = 500mm, working pressure P = 5,5MPa. Customer – UMG “Lvovtransgas” “Ukrtransgaz”.
Overhaul of overhead crossings MP, Dn = 1200 mm and MP with Dn = 1400mm through the floodplain of the river. Stryi. Ukraine, Kiev region; Customer – UMG “Lvovtransgas” “Ukrtransgaz”.
Overhaul MP “Kiev-western border of Ukraine”, Dn= 1000mm, working pressure P = 6,5MPa. Customer – UMG “Kievtransgaz” “Ukrtransgaz”.

Overhaul of main oil and gas pipelines

main-photo4

2019 г. Reconstruction of the section of the Lisichansk-Kremenchug oil trunk pipeline DN 1000 mm Ru 5.5 MPa per 358 km during the construction of the Kobelyaki city bypass on the km 116 + 500 – 119 + 700 km during the reconstruction of the state highway N-31 Dnepr-Tsarichanka- Kobelyaki-Reshetilovka, Poltava region.
Reconstruction of the section of the SOYUZ gas pipeline Du 1400 mm Ru 7.5 MPa for 1633 km during the construction of the Kobelyaki bypass on the 116 km + 500 – 119 + 700 km section during the reconstruction of the national highway N-31 Dnepr-Tsarichanka-Kobelyaki- Reshetilovka, Poltava region.
2011 year Repair insulation coating pipeline Lugansk-Lysychansk-Rubizhne, 2 thread. DN500 Ru5,4MPa with partial replacement of the pipe (up to 10%), L = 17km, UMG “Donbastransgaz”.
2006 year Overhaul of the insulating covering MP “Central Asia – Center-4» Dn = 1400mm, working pressure P = 6,5MPa. Kazakhstan. Customer – JSC “Intergas Central Asia”.
2003 year Overhaul of the insulation coating portion MP “Ukhta-Torzhok 2», Dn = 1200 mm, operating pressure P = 5.5 MPa. The works were carried out on the territory of the Tver region. Russian Federation. Customer – LLC “Severgasprom”, Ukhta.